In December 2018, APAVE Asia - Pacific signed 2 contracts with 2 companies, who invested 2 Solar Power Plants in Tay Ninh province. These power plants named Bach Khoa A Chau Tay Ninh & Tri Viet Tay Ninh, located in Suoi Day & Tan Phu commune – Tan Chau District – Tay Ninh province – Viet Nam. These plants have a capacity of 30MW and after going into operation, they will supply electricity to the regional grid. The project has total investment up to 1200 billion VND.

The service delivered by APAVE in this project is PMC (Project Management Consultancy), which the main mission is to manage the project, ensure that the project shall be completed on schedule, meet the quality requirements and specifications according to Vietnamese construction laws & regulations, and also the requirements of the client.

The project will last for 6 months, with the goal of putting the plants into operation by the end of June 2019. Within 6 months, APAVE will perform not only Project Management Consultancy (PMC) but also Construction Supervision Consultancy (CSC) services with scope covering the following items:

- 2 Substations 110kV of 2 Solar Power Plants – main contractor PCC1

- Switch station – main contractor PCC1

- Transmission line (~ 8.4 km) – main contractor PCC1

- BKAC 30MWp Solar power plant – Chinese main contractor: An Huy 2

- Tri Viet 30MWp Solar power plant – Chinese main contractor: Hoa Viet 1

  

The specific tasks that APAVE performs during project implementation include:

- Manage and supervise construction

- Monitor the volume, quality and progress of each work item & the overall construction

- Ensure the safety, environmental sanitation on site

- Control documents during management & supervision

- Coordinate with the client for PMC task

 

After nearly 3 months of implementing the project, APAVE has proven the competence, professionalism and highly appreciated by client. Surely, APAVE will complete the mission successfully, contribute to the success of project.

 

 

In December 2018, APAVE Asia Pacific signed 2 contracts with 2 companies, who had the aim of investing in building 2 Solar Power Plants in Tay Ninh province. These power plants named Bach Khoa A Chau Tay Ninh & Tri Viet Tay Ninh. They both have a capacity of 30MW and after going into operation, they will supply electricity to the regional grid. The project has total investment up to 1200 Billion VND, and located in Suoi Day & Tan Phu commune – Tan Chau District – Tay Ninh province – Viet Nam.

The service delivered by APAVE in this project is PMC (Project Management Consultant), which the main mission is to manage the project, ensure that the project shall be completed on schedule, meet the quality requirement and specification according to Vietnamese construction laws & regulations, and also the requirement of the client. The project will last for 6 months, with the goal of putting the plants into operation by the end of June 2019. Within 6 months, APAVE will not only perform project management, but also perform the CSC (Construction Supervisor Consultant), with scope covering the following items:

-          2 Substations 110kV of 2 Solar Power Plants – main contractor PCC1

-          Switch station – main contractor PCC1

-          Transmission line (~ 8.4 km) – main contractor PCC1

-          BKAC 30MWp Solar power plant – Chinese main contractor: An Huy 2

-          Tri Viet 30MWp Solar power plant – Chinese main contractor: Hoa Viet 1

The specific tasks that APAVE performs during project implementation include:

-          Manage and supervise construction

-          Monitor the volume, quality and progress of each work item & the overall construction

-          Ensure the safety, environmental sanitation on site

-          Control documents during management & supervision

-          Coordination with the client for PMC task

After nearly 3 months of implementing the project, APAVE has proven that we are a professional organization, overcome difficulties to lead the project to the required goal, bringing satisfaction to the client.

 

Group Information Read more

Making Our World Safer (NSC) and a Mission of Trust (Apave)… two visions combining to offer Apave’s international customers globally-recognized, qualitative approach to defensive driving training.

 

 

Th...

Newspaper information Read more

Hanoi (March 7th, 2017), The Executive Vice President of Apave Group (French) – Mr. Nguyen Cong Phu - General Director of Apave Asia Pacific had a working visit at Vietnam Construction Ministry. He was received...

Specialist News Read more

The urbanization level in China is presently around thirty-six (36) percent.  Experience elsewhere, indicates that as the urbanization level reaches thirty (30) percent, the country enters a stage of accel...

Contact Us and FAQ

(04) 3 787 7880
(08) 3 990 5588 

  • 1000 Professionals 8
  • Branches
  •  
  • 3 Representative Offices 
  •  
    6
  • Subsidiaries China, Korea, Japan, Malaysia, Myanmar, Singapore
Copyright APAVE @2013